P-51, T-6, Hamilton Standard, Curtiss Wright, and Franklin Engine manuals added to AirCorps Library this week!
But before we get into all that, I'd like to share a neat user story. Some of you may have heard me mention the B-25 History Project, and the great work that they do. If not, now is your chance to take a look at their website and get acquainted! This group has compiled what can only be described as a staggering amount of historical information related to the B-25, and it's history in Kansas City. In addition, there are several small scale restoration projects going on in their shop at any given time, including an 8 gun nose, instrument panel, and several working radio sets!
The images below are a before and after of one of the latest parts that they've been using AirCorps Library drawings to fabricate, the B-25 auxiliary landing gear trunnion fitting assembly, part number 62-34106.
It's always fun to see the site in use this way, and to help such a great organization!
.
Wright Aeronautical Engine Specifications (A Division of Curtiss-Wright):
Curtiss really did "do it all" during the war - it's not many companies that say that they produced both aircraft and engines for the war effort. The company history goes back to 1929, and they are still in business today! The engine specifications added this week relate to what would now be considered Curtiss-Wright "legacy" items, but they're still cool for us!
739C18BA3, 745C18BA3, 749C18BD1 and 749C18BD3 Double Row Cyclone, E-218-10, 9-June-1954
739C18BA3, 745C18BA3, 4, 749C18BD1, and 3 Double Row Cyclone, E-218-11, 20-July-1959
702C9GC, 704C9GC, 728C9GC, 730C9GD, 731C9GC, Cyclone, E-219-6, 16-Oct-1947
702C9GC, 704C9GC, 728C9GC, 730C9GD, 731C9GC, Cyclone, E-219-8, 11-Mar-1960
736C9HD, 737C9HD, 740C9HD, 977C9HD1, 987C9HD1 Cyclone, E-243-5, 31-May-1957
736C9HD, 737C9HD, 740C9HD, 977C9HD, 989C9HD1 Cyclone, E-243-6, 23-July-1959
742C14BB1, 2, 3, Cyclone, E-248-1, 10-Dec-1946
955C9HE, 959C9HE, 960C9HE, R-1820-80 Cyclone, E-259-4, 12-April-1957
957C7BA1 Cyclone, E-261-1, 20-Jan-1950
957C7BA1 Cyclone, E-261-2, 11-Dec-1959
956C18CA1 and 975C18CB1 Double Row Cyclone, E-270-4, 10-Mar-1953
972TC18DA and R-3350 Double Row Turbo Cyclone, E-272-6, 28-Nov-1956
981TC18EA1, 2, 3, 4, 5, 6 Double Row Turbo Cyclone, E-287-3, 14-Nov-1957
990C7BA1 Cyclone, E-289-1, 18-June-1959
Franklin Engine Specifications:
6A8-215-B7F, -B8F, and -B9F Air Cooled Motors, E-242-3, 26-Jan-1951
6V4-176, -178, -165, -200, 6V-335, O-335, and YO-335 Air Cooled Motors, E-244-12, 18-April-1958
6V6-245-B16F and O-425-1 Air Cooled Motors, E-258-3, 6-Mar-1952
T-6 Texan Manuals:
Parts Catalog for T-6D, T-6F, AT-6D, AT-6F, SNJ-5, and SNJ-6, AN 01-60FF-4, 13-July-1948
Flight Manual for LT-6G Aircraft, T.O. No. 1T-6(L)G-1, 31-Dec-1962
Inspection Requirements for T-6, SNJ, T.O. No. 1T-6C-6, 31-Dec-1953
Maintenance Instructions for T-6G and LT-6G, T.O. No. 1T-6G-2, 24-May-1956
Illustrated Parts Breakdown for T-6G and LT-6G , T.O. No. 1T-6G-4, 29-June-1962
P-51 Mustang Manuals:
One lonely P-51 manual added this week!
Hamilton Standard Service Bulletins:
Selector Valve Sleeve Change in 5AA22 Controls, No. 609, 19-Feb-1960
5U21, 5AB23 Head Thrust Plunger Change, No. 611, 26-Jan-1960
Re-Routing 5AA22 Control Receptacle Pressure Passage, No. 612, 19-Feb-1960
Thinner Servo Piston Sealing Rings, No. 614, 21-April-1960
Pitch Lock Propeller Servo Valve Seal Back-Up Rings, No. 615, 6-May-1960
Preformed Packing Standardization for all Hydromatic Propellers and Associated Equipment, No. 616, 14-May-1960
Change in Spinner Dowel Bushing Material, No. 617, 26-May-1960
New Potted Stepmotor Stators, No. 618, 30-June-1960
Heat Treating Control Mounting Gaskets, No. 619, 30-June-1960
Lubricating Grooves in Control Drive Gear Bushings, No. 620, 18-Aug-1960
Addition of Switch Supports on Spinner Bulkheads, No. 621, 2-Sept-1960
Return to Factory of Blades Requiring Re-Cold Working, No. 622, 15-Sept-1960
Return to Factory of Blades Requiring Re-Cold Working, No. 622A, 18-Nov-1960
Rubber Cure Date and Rubber Age Control Policy, No. 624, 1-Oct-1960
Blade Model 6903 Re-Shotpeening, No. 625, 14-Feb-1961
34E60 Propeller Dome Lug Clearance, No. 626, 17-Feb-1961
Adding Radii to 43E60 and 43H60 Stationary Cam Dowel Hole, No. 627, 18-April-1961
Operating Recommendations & Barrel Rework, 33E60 Props, 6491-0 & 6801-0 Blades, C-82 Aircraft with R-2800 Engines, No. 628, 15-Jan-1962
Operating Restrictions for 23E60 6507-0 Type Propellers with P&WA R-2000 Series Engines on DC-4, No. 629, 6-April-1962
Application of Blade Alignment Indicator Gage HS 8250, HS 8350, and HS 8550, No. 631, 31-Dec-1963
Revised Barrel Half Dimension Requirements, No. 632A